WattTonne. Electric trucking, weighed
Country · Netherlands

WattTonne Netherlands

Europe’s fastest fleet conversion — registrations doubled in 2025 on the AanZET grant and a CO₂-graded toll.

up to €115,200/truck
AanZET grant
€0.038/km
CO₂ toll spread
open to 29 Sep
2026 window
4 live
Milence hubs

What moves the numbers

Lever

AanZET subsidy

Second 2026 window open to 29 September; covers up to 45% of the electric-vs-diesel price gap.

Lever

CO₂-graded toll

€0.187/km diesel vs €0.149/km zero-emission — a structural per-km saving.

Lever

MIA/Vamil

Accelerated depreciation on the electric truck investment.

Fleets on the ground

Case

Simon Loos — 150 eActros 600 by end-2026

First 75 ordered autumn 2024, a further 75 in March 2026. Daily 180–220 km distribution; payback 4.2 years with AanZET + toll.

Case

EUTRACO — 54 trucks, Antwerp–Rotterdam

14.4 MW on-site charging; 85 km corridor, 2× daily.

Evidence for Netherlands

Dutch-relevant models (eActros 600, Volvo FM/FE, DAF XD) lead the Evidence Files on regional duty cycles.