Kuehne+Nagel starts operations at Milence’s first UK hub — Immingham goes live

← News archive

News · 2026-04

Kuehne+Nagel starts operations at Milence’s first UK hub — Immingham goes live

April 2026: one of Europe’s largest 3PLs begins charging operations at the Immingham fast-charging hub — the UK’s first Milence site and a named-fleet anchor for British corridor charging.

2026-04-20 · WattTonne news desk · archive edition (compiled at relaunch, event date as shown)

Immingham, April 2026 — Kuehne+Nagel has begun operations at Milence’s first UK fast-charging hub for electric trucks, at Immingham on the Humber — one of Britain’s busiest freight gateways. The combination matters more than the opening itself: a named global 3PL putting daily fleet volume through a public truck-charging site is exactly the anchor-tenant pattern (Kaufland at Barsinghausen, Volvo at Ghent) that de-risks charging infrastructure utilisation.

The UK context makes it doubly significant. Britain is simultaneously running Europe’s most generous demand-side package — Plug-in Truck Grant paying up to £81,000 per large tractor from April 2026 (after a £120,000 peak in Q1), the Depot Charging Scheme funding 70% of infrastructure, and a consultation on ending new diesel HGV sales by 2040. Public corridor charging has been the missing layer; Immingham is the first of it at alliance scale, with BP Pulse planning MCS-capable charging at Ashford International Truckstop within the year.

Why fleets outside the UK should care. Immingham is also the rehearsal space for the UK’s second 2026 infrastructure experiment: Swaptopus, the CATL–Octopus battery-swap venture targeting UK super-hubs from 2027. Britain now hosts both infrastructure models building out on the same policy stack — charging via Milence/BP, swap via Swaptopus — which makes it the cleanest head-to-head test Europe will get this decade. Fleets with UK operations should model both against the grant window; our UK case study and UK fleet guide carry the parameters.

Sources
  • Milence corporate timeline (April 2026)
  • ITK Research UK infrastructure analysis
  • UK DfT/OZEV programme documentation

Archive news entry: real event, original date and source cited; compiled into the WattTonne archive at relaunch. Corrections: hello@wattonne.com.