UK Plug-in Truck Grant tapers from April: £120k peak becomes £81k — plus 100-truck annual cap
UK Plug-in Truck Grant tapers from April: £120k peak becomes £81k — plus 100-truck annual cap
1 April 2026: the grant’s January peak ends — caps step down to £15k/£37k/£52k/£81k by weight class, still up to 40% of purchase price, with per-customer limits of 100 trucks per year from FY2026/27.
2026-04-01 · WattTonne news desk · archive edition (compiled at relaunch, event date as shown)

The UK’s Plug-in Truck Grant tapered on 1 April 2026 as legislated: the January–March peak caps (£20k/£60k/£80k/£120k by weight class) stepped down to £15,000 (4.25–12t), £37,000 (12–18t), £52,000 (18–26t) and £81,000 (>26t articulated) — still covering up to 40% of the purchase price. From financial year 2026/27, per-customer volume caps apply: 100 trucks per end customer per year.
The taper’s effect on Q1 was visible in the registration data: a pull-forward of orders into the peak window, exactly as designed — the grant was engineered to build the fleet, infrastructure base and used-market pipeline early, then normalise. Fleets that bought in Q1 captured up to £39,000 more per large tractor than April buyers; the window dynamics repeat annually, so FY2026/27 planning should assume similar first-come mechanics.
Even tapered, £81,000 is Europe’s richest national purchase grant (AanZET’s €115,200 ≈ £100k is the only rival) — and it stacks with the Depot Charging Scheme’s 70% infrastructure coverage. The UK remains the demand-side laboratory of European truck electrification, with Swaptopus choosing it for the same reason.
- UK Subsidy Advice Unit (2026-03-24)
- DfT grant documentation
Archive news entry: real event, original date and source cited; compiled into the WattTonne archive at relaunch. Corrections: hello@wattonne.com.